SOW Report
Contract 84041 REL 46: 1993-066-00 EXP OREGON FISH SCREENS PROJECTS, O & M
Project Number:
Title:
Oregon Fish Screens Project
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau John Day 100.00%
Contract Number:
84041 REL 46
Contract Title:
1993-066-00 EXP OREGON FISH SCREENS PROJECTS, O & M
Contract Continuation:
Previous: Next:
84041 REL 32: 1993-066-00 EXP OREGON FISH SCREENS PROJECTS, O&M
Contract Status:
Issued
Contract Description:
The project provides immediate and long-term protection for anadromous and resident fish species in the Hood River, Deschutes, Grande Ronde, Imnaha, John Day, Umatilla, and Walla Walla, Willamette River, North Coast (lower Columbia tributaries), and other Columbia River subbasins by ensuring proper operation and maintenance of protection and passage devices on diversions and dam structures. Thousands of water diversions exist in the Columbia Basin in waters home to anadromous fish, including many listed on the Endangered Species Act. ODFW works with water users to install fish screens to prevent fish injury and mortality associated with the diversion of water. Fish screens operate in challenging environments that include extreme cold temperatures to extreme heat. Fish screens are also exposed to floating debris ranging from sediment to large trees that damage screens resulting in fish loss. Proper fish screen maintenance is required for fish screens to prevent fish injury and mortality associated with water diversions. BPA funds are critical to ODFWs’ fish screen program. The program also uses cost share from PCSRF, ODFW License Surcharge, ODFW General Fund, and BPA for implementation. These funds are used to adjust and maintain fish screens as necessary to keep them operational and in service to protect ESA listed and resident fish. This contract will administer the fish screen program, provide operation and maintenance of existing screen and passage structures, design new or replacement structures, and maintain program facilities.  

The scope of the 2025 contract includes non-reoccurring maintenance funds for projects which been scoped in Line-Item Budget (LIB) and defined in discrete Work Elements. The LIB also includes capital improvements to increase maintenance capabilities for specific regional O & M needs.

The BPA COR will continue to engage ODFW staff with modernizing geodatabase and mapping to ensure this program's accomplishments are communicated to the broader community and future reporting needs with the NPCC. Maintenance activities reporting was added for each Work Element; this will facilitate the annual program reporting.
Account Type(s):
Expense
Contract Start Date:
01/01/2025
Contract End Date:
12/31/2025
Current Contract Value:
$2,451,662
Expenditures:

* Expenditures data includes accruals and are based on data through 31-Dec-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

Contract(s):

84041 REL 46

Location: 45.400525° N, -117.251542° E

Dimensions: 2048 x 1536

Contract(s):

84041 REL 46

Dimensions: 1152 x 1536

Contract(s):

84041 REL 46

Location: 45.400361° N, -117.251792° E

Dimensions: 2048 x 1536

Contract(s):

84041 REL 46

Dimensions: 960 x 1280

Contract(s):

84041 REL 46

Dimensions: 1803 x 1352

Contract(s):

84041 REL 46

Dimensions: 5712 x 4284

Contract(s):

84041 REL 46

Dimensions: 3024 x 4032

Contract(s):

84041 REL 46

Dimensions: 4032 x 3024

Contract(s):

84041 REL 46

Dimensions: 2000 x 924


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Administration of BPA contract. 12/31/2025
Submit relevant Environmental Compliance documentation C: 165. Complete Environmental Compliance Requirements. 12/31/2025
Submit relevant Technical documentation. D: 122. Technical Review of Fish Screening and Passage Projects 12/31/2025
Regional Operations and Maintenance Reporting. E: 186. Maintain Screen and Passage Devices - John Day Screen Shop 12/31/2025
Regional Operations and Maintenance Reporting. F: 186. Maintain Screen and Passage Devices - The Dalles Screen Shop 12/31/2025
Regional Operations and Maintenance Reporting. G: 186. Maintain Screen and Passage Devices - Enterprise Screen Shop 12/31/2025
Complete and document non-occurring maintenance. H: 208. Non-recurring maintenance on the John Day Screen Shop screen replacements 12/31/2025
Conduct and document non-occurring maintenance. I: 186. Non-recurring maintenance on The Dalles Screen Shop Projects 12/31/2025
Conduct and document non-occurring maintenance. J: 208. Non-recurring maintenance on Enterprise Screen Shop replacement projects 12/31/2025
Conduct and document non-occurring maintenance. K: 186. Non-recurring maintenance on the John Day Screen Shop maintenance projects 12/31/2025
Conduct and document non-occurring maintenance. L: 186. Non-recurring maintenance on 10 Enterprise Screen Shop projects. 12/31/2025
Completed Progress (Annual) Report M: 132. Submit Progress Report for the period (Jan 2024) to (Dec 2024) 04/01/2025

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 5 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 208 Irrigation Infrastructure Construction or Replacement
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 6 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 208 Irrigation Infrastructure Construction or Replacement
Cutthroat Trout, Westslope (O. c. lewisi)
  • 5 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 208 Irrigation Infrastructure Construction or Replacement
Trout, Bull (S. confluentus) (Threatened)
  • 5 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 208 Irrigation Infrastructure Construction or Replacement
Trout, Interior Redband (O. mykiss gairdnerii)
  • 5 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 208 Irrigation Infrastructure Construction or Replacement

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Administration of BPA contract.
C 165 Complete Environmental Compliance Requirements.
D 122 Technical Review of Fish Screening and Passage Projects
E 186 Maintain Screen and Passage Devices - John Day Screen Shop
F 186 Maintain Screen and Passage Devices - The Dalles Screen Shop
G 186 Maintain Screen and Passage Devices - Enterprise Screen Shop
H 208 Non-recurring maintenance on the John Day Screen Shop screen replacements
I 186 Non-recurring maintenance on The Dalles Screen Shop Projects
J 208 Non-recurring maintenance on Enterprise Screen Shop replacement projects
K 186 Non-recurring maintenance on the John Day Screen Shop maintenance projects
L 186 Non-recurring maintenance on 10 Enterprise Screen Shop projects.
M 132 Submit Progress Report for the period (Jan 2024) to (Dec 2024)